Buy with a builder's questions

Land through a builder's eyes.

A listing shows the view. Peter looks at the road, water, power, septic, terrain, fire exposure, permit path and what it may really take to build there.

Builder's checklist

The property is the first construction decision.

These are the systems and constraints Peter begins with. A real feasibility review can require county records, licensed specialists, engineering, surveys, soils work and other investigations.

01

Year-round access and practical construction road

02

Water source, production and real connection cost

03

Power availability or an honest off-grid budget

04

Septic, perc, soils and reserve area

05

Build envelope, setbacks and terrain

06

Fire, flood, slide, zoning and insurance exposure

07

Coastal versus inland permit path

08

True cost from raw land to occupancy

Property Feasibility Sprint

A focused contractor review before you commit.

$2,500. A focused preliminary construction review of one property before you commit.

  • Written note on access, water, power, septic, fire and permit path
  • 30–45 minute call
  • Fee credited to a PB build

This is not a survey, appraisal or broker opinion. Public-record costs, engineering, surveys, soils, design and specialty investigations remain separate when needed.

ASK ABOUT A REVIEW

Have one property in mind?

Send the link before you fall in love with the view.

CALL PETERTEXT PETER