Owned by Peter · Cleared and taken to permit-ready
Advance the land before the building.
Peter acquired the property, demolished the existing buildings and created a clean building pad.
He prepared the existing well for connection, secured a power drop, moved an existing power line out of the planned building area, and obtained septic approval, approved plans and a building permit.
Project scope
What PB delivered.
The work is shown plainly, from the starting condition through the completed result.
Property acquisition
Existing-building demolition
Clean building pad
Well preparation
Power-drop preparation
Power-line relocation
Septic approval
Approved building plans
Approved building permit
Permit-ready sale
How the work came together
Construction with context.
01Approved path
A designed, permit-ready handoff.
The approved design was for a new 80-by-50-foot, 4,000-square-foot pre-engineered metal-building residence.
The approved plans and building permit transferred to the buyer with the sale. Exact address and architectural drawings remain private.