Stabilize + rebuild
Support first. Then reframe.
Temporary support walls held the building while rotten studs were removed.
PB reframed the damaged walls, installed new structural sheathing and wrapped the building.

Building rescue · Anderson Valley · 2026
Built by PBA failed two-story exterior stripped back to sound structure, reframed, resheathed and rebuilt as a sealed, metal-clad envelope.
See the project story ↓Completed exterior after structural repair, new sheathing, housewrap and metal siding.
Built by PB
PB removed the failed exterior siding and exposed framing that also required replacement. The affected walls were stripped back so reconstruction could begin from sound structure.
This was a building-rescue sequence: selective demolition, temporary support, structural repair and a completely new weather-resistive exterior.
Project scope
The work is shown plainly, from the starting condition through the completed result.
Project record · 8 photographs







How the work came together
Stabilize + rebuild
Temporary support walls held the building while rotten studs were removed.
PB reframed the damaged walls, installed new structural sheathing and wrapped the building.
Close the envelope
Finished metal siding completed the exterior and left the building sealed and weatherproof.
After the work, the owner listed the property and it sold within one month. That is project sequence, not a claim that the reconstruction caused the sale.
When rot is hidden behind siding, the honest scope starts with opening the wall and rebuilding from sound structure.
Planning a rural build?
Talk with Peter about access, utilities, sitework, structure and the real path from the first field decision to a finished place.